Tom Price

Please take the time to read through the information below to ensure your mobilisation happens quickly and smoothly.

IN ORDER TO TO MOBILISE TO RIO TINTO TOM PRICE, THE FOLLOWING MINIMUM REQUIREMENTS MUST BE MET:

Prior to mobilising to a MinRes site (FIFO) or entering site (DIDO), you will be required to undertake a COVID-19 RAT test.

  • Please note you must have a negative RAT test completed prior to flying/driving to site, tests must be taken between 12.00pm – 06.00pm on the day before you mobilise to site.
  • Register your negative test result using the following link
  • Please register your Pre-Mobilisation RAT Test here where you will be required to upload a photo of your negative RAT (with the current date written on it) alongside your driver’s licence.
  • This photo will also be requested at the airport as part of our pre-flight screening – or when arriving at site if driving.

If you have any issues or concerns, please present at the airport with your negative RAT and speak to our COVID-19 screening team for guidance.

Make sure you report any positive RAT results to your supervisor and our COVID-19 Support team at health@mrl.com.au and follow associated isolation and testing protocols.

You must return a negative COVID-19 test result within 24 hours before you mobilise. You will need to show your clear results at airport screening for Rio Tinto Testing facility to obtain your wrist bands to board aircraft, if you show your Valid MRL COVID-19 PCR test at the Rio Tinto Tent at Perth Airport Terminal Locations they should complete partial testing and supply wrist bands to board aircraft.

For Regional locations please contact your MRL Rio Tinto Site administration team for Update locations.

  • Current Driver’s Licence Back & Front – Check the status of a WA Licence 
  • Working at Heights (within 2 year period role specific)
  • Confined Space (within 2 year period role specific)
  • Gas Testing (within 2 year period role specific)
  • CPR & LVR (within 12 months validity – Electricians only)
  • Section 44 (Supervisors only)

If you’re unsure of the role-specific ticket requirements, please as your MRL site contact.
Your site contact is the person who engaged you on your specific project or site to undertake work.

Aveling Classroom Training

  • RTIO PRH Hub Essentials – Part of first day
  • RTIO PRH Hub Essentials for Site – Part of first day
  • RTIO Lock Holder – Part of first day
  • RTIO Personal Isolation Officer – Second day
  • Electrical Workers Competency + Arc Flash (Electricians only) – Additional day of training
  • Permit Isolations Officer (Electrical Supervisors only)

RTIO Scodle must be provided with your mobilisation request submission:

RTIO Online Scodle Training Mining

  • PRH Rio Tinto Essentials (WBT) – must be valid
  • RTIO Tom Price Pit Operations
  • RTIO (WA) Extinguisher Use
  • RTIO Noise awareness Presentation
  • RTIO Manual Handling Awareness
  • RTIO Heat Stress Training and Assessment
  • PRH Cov-19 Social Distancing and Hygiene
  • RTIO Land Clearing (DOZER OPERATORS ONLY) – (CERTIFICATE WILL NEED TO BE SAVED AS THE COMPLETION DOESN’T APPEAR ON THE PROGRESS REPORT)
  • RTIO Pit Permit Rules V19 Awareness
  • RTIO Pit Permit Rules V19 Driving
  • RTIO Pit Permit Rules V19 Engagement
  • RTIO Respiratory Awareness Session
  • RTIO Fibrous Minerals Awareness
  • RTIO Geotech Hazards For Natural Slopes
  • RTIO Basic Geotechnical Awareness
  • RTIO Positive Radio Communication

RTIO Online Scodle Training AMG

  • PRH Rio Tinto Essentials (WBT) – must be valid
  • RTIO Tom Price Pit Operations
  • RTIO (WA) Extinguisher Use
  • RTIO Noise awareness Presentation
  • RTIO Manual Handling Awareness
  • RTIO Heat Stress Training and Assessment
  • PRH Cov-19 Social Distancing and Hygiene
  • RTIO Pit Permit Rules V19 Awareness
  • RTIO Pit Permit Rules V19 Driving
  • RTIO Pit Permit Rules V19 Engagement
  • RTIO Respiratory Awareness Session
  • RTIO Fibrous Minerals Awareness
  • RTIO Geotech Hazards For Natural Slopes
  • RTIO Basic Geotechnical Awareness
  • RTIO Positive Radio Communication
  • RTIO MEM Essentials

All Rio Tinro mobilisation submissions require a minimum of 7 days’ notice. 

Should you need to mobilise outside of this timeframe, you must seek MRL GM approval using the below approval template.

GM Approval Request Template that must be used:

POSITION: XXXX
COMPANY: XXXX
SITE: XXXX

As the General Manager responsible for this request, I hereby approve for the above worker to be expedited and acknowledge the below site entry requirements may not be met prior to arrival on site.

  • Medical / MRL DAS results (including Medical Declaration & FFW)
  • 4 x MRL Online pre-mob Inductions
  • Any other non-client related site entry requirements

Please note Rio Tinto requirements cannot be exempt by any MRL person.

The approval must be uploaded into the INX +process workflow prior to submission.

  • You’re required to complete an online induction via our Learning Management System (LMS).Once your mobilisation workflow has been committed, new profiles will be sent an auto email with login details to complete the mandatory inductions.If the profile already exists please provide the below link to your personnel and advise them to complete a password reset (noting that the username is the email address provided in + Process)

    MRL – LMS Induction Landing Page

    If you have trouble logging in or have any questions, please email our Induction Support team.

    Our Inductions team is available to assist you:
    Monday – Friday | 8:00am – 5:00pm
    Ph: 08 9315 8950 (option 1)

SUBMITTING YOUR MOBILISATION APPLICATION:

Once you’re ready to submit your mobilisation, make sure you have all the required documents (filled out) on hand:

1. Log in to our INX+ Process System – submit your details and site entry requirements.
2. Your mobilisation will then be in the system for processing and you’ll receive communication from the system with the status of your mobilisation once in progress.
3. Once all requirements have been met, your mobilisation is confirmed and you’ll receive confirmation from our Mobilisations team.